The Westin Hotel

Summary

Butters-Fetting Co was brought in to design and build the HVAC and plumbing systems for the Westin in beautiful downtown Milwaukee. The new hotel included 220 rooms and suites, a restaurant, lobby bar, fitness center, 9000 square-feet of meeting facilities and a 5000 square-foot ballroom. The hotel utilized a VRF system optimizing control over the spaces and providing energy savings.